Included in the package is the delivery of the project’s striking angled façade. The complexity of the project resulted in 4 different types of SPIDI Max façade bracket being utilised within the construction, supplied by Fixfast. The versatility of these brackets was clearly demonstrated in the project, showing multiple configurations of brackets and sizes to suit the building.
The project continues to progress into Summer 2024.